Ansaldo, together with Doosan as the main contractor and Suez Energy, is to supply three 166 MW V94.2 combined cycle gas turbines for power and desalination at phase 2 of the Barka project in Oman.
The turbines are to be delivered in July and August 2007.
Ansaldo Energia is also to supply a 64.3A gas turbine and related alternator to GEA Energy System for a 95 MW combined cycle plant in Valuthur, Tamil Nadu, in India.