The discovery includes 1.1m of 295.69 g/t silver at hole QMG10-10; 0.15m of 82.82 g/t gold at hole QMG10-07; and 0.85m of 10.41 g/t gold, 156.15 g/t silver and 4.46% zinc at hole QMG10-12.
Q-Gold owns 93% of the discovery, and had completed a Phase II diamond-drilling program on the McKenzie Gray property that consists of 18 drill holes totaling 2,612m in November 2010, Q-Gold.
This drilling program was designed to follow-up on the 2009 drill program, which identified significant gold, silver and zinc mineralization.
In the 2010 program, 13 drill holes (QMG10-1 to 12) tested the mineralized zone to a depth of 150m, and the remaining five consisted of shallow dipping drill holes (-40o) to test the mineralized zone near surface (QMG10-14 to 18).
The new drilling was completed on the same cross-sections as the 2009 drill holes, spaced at 15m intervals.
Q-Gold is currently exploring for precious and base metals on its 26,000 acres of Ontario holdings in the Gold Camp at Mine Centre.