The solution incorporates three synergistic components including diagnostic tools, engineered cement systems, and a zonal isolation assurance tool.

With this new service Halliburton continues to evolve the cementing operation beyond the conventional cement-design method that predominantly focuses on well-construction activities.

This service is reported to be an interventionless ‘react-and-respond’ solution designed to help address the industrywide challenge of the loss of zonal isolation due to changes in the wellbore that can stress the cement sheath and lead to destabilization at any point during the life of the well.

Halliburton noted that its WellLife III cementing service is designed to stop the flow of unwanted fluid and gas in the annulus at any time during the life of the well, preserving production while reducing or even eliminating costly remediation.