Clavijo has invested about EUR80m in the solar power project, which has an installed capacity of 33MW.

The energy generated by the solar PV facility is enough to power about 30,000 inhabitants.

The solar farm was assembled and installed over 15 months, and the installation will provide CO2 emissions savings of up to 120,000 tons per year.

Clavijo, headquartered in Viana (Navarre), has three business divisions, one of which specializes in renewable energies, specifically the design, manufacture and assembly of fixed structure and single and dual axis solar trackers.