The solar project is expected to be interconnected to the San Diego Gas & Electric (SDGE) grid as a qualified facility for a large generator interconnection agreement.
The integration with SDGE will be under California Independent System Operator Corporation (CAISO) jurisdiction and is expected to be energized in the first half of 2013.
Satcon’s Equinox Platform solution is an integrated multi-megawatt medium voltage building block used in solar power conversion.