Minimum level at draft tube (controlled by a weir in the Bogong Power Station)
641.5
Mean operating level
645.5
Maximum normal operating level
649.68
Maximum flood level (Lake Guy)
653
1 Bogong Power Development Tunnel and Civil Works Contract, Volume 1, Formal Instrument of Agreement, Schedule 10B – Technical Particulars, AGL September 2006
Sign up for our weekly news round-up!
Give your business an edge with our leading industry insights.