These two wind farms, located on the private property of Seminaire de Quebec, will be operational by the end of 2013 at the latest. The Seigneurie de Beaupre, host of Boralex and Gaz Metro projects, reportedly gives them distinctive advantages, offering exceptional wind fields due to the quality of the wind itself.

This site is located outside any urban or residential area: 60km northeast of Quebec City and 15km north of Saint-Tite-des-Caps.

Patrick Lemaire, president and CEO of Boralex, said: This breakthrough in wind power in Quebec represents a great day for Boralex and its partners. The wind farms of Seigneurie de Beaupre are the result of a close relationship with Seminaire de Quebec. Without their open-mindedness and input, we would never have been able to propose such quality projects.