TSK solar will be the engineering, procurement and construction contractor of the plant located in the North Eastern town of Loiza co-developed by Uriel Renewables and Coqui Power LLC.

Expected to be completed in December 2012 the project will be compliant with the technical requirements of the Puerto Rico Electric Power Authority (PREPA).

TSK Solar general manager Roberto Montes remarked that the PV project was designed and engineered to operate in a challenging electrical environment of the Caribbean region.

"This PV project has proven to have an extra degree of complexity, as we needed to plan, design and engineer for weather conditions particular to the Caribbean region ranging from hurricanes and flooding to a variety of soil types," said Montes.