Work will focus on the Pass zone and consist of re-logging of historical drill core as well as diamond drilling.

The primary objectives of the 2015 program are:

  • To integrate all available drill data from prior drilling campaigns into the project database using consistent current logging standards to facilitate lithology, alteration and sulphide species modelling. This program was initiated in 2014 and will be continued in 2015; and
  • Drill up to 2 core holes totalling approximately 1200 metres to test historical analytical results from two historical drill holes and test that portion of the chargeability/resistivity signature located by the 2014 Quantec survey in the Pass zone area.

Carmax Mining president and CEO Jevin Werbes said: "We are very pleased to be back up at the Eaglehead continuing to assemble the historical data into our updated model. With concentration now moving forward into the Pass zone, we look forward to include what we learnt this season into the well-defined data already in place on the Bornite and East zones."