Test production rates for these wells ranged from about 500 barrels of oil per day to as high as 1,300 barrels of oil per day of high API gravity oil. Gas production rates averaged about 1.5 million cubic feet per day for each well.

No further delineation drilling is planned for Pioneer or Rendezvous at this time. These two accumulations will be pursued as possible satellite developments with processing at the Alpine facilities in the Colville River Unit.

ConocoPhillips is operator of and holds a 78% interest in the Greater Mooses Tooth Unit, while Anadarko holds a 22% interest.