A 100,000 lb. slick-water fracture treatment has been executed over the entirety of the 90ft of hydrocarbon bearing interval.

The company drilled the vertical well to a depth of 3863′ to test the hydrocarbon bearing siltstone in the Lower Mancos "C"/Niobrara sands, up-dip from on trend oil production.

Dejour is the operator of the project and has a 50% working interest in the test well and an average 56% working interest in the surrounding 7,000 acres.

Dejour operates projects in North America’s Piceance Basin (107,000 net acres) and Peace River Arch regions (15,000 net acres).