To date, 27 of 28 holes drilled by the company at Gossan Hill have produced gold mineralization.

According to the company, DDH GOS 27 was abandoned at 52 meters due to deviation.

The mineralized intersection in hole GOS 28 occurs approximately 100 meters down strike and dip of GOS 25 hole, which graded 9.73 grams of gold per tonne and 6.91 grams of silver per tonne over a core width of 5.75 meters.

The gold and silver mineralization at Gossan Hill is strongly associated with sulphide mineralization (pyrite, chalcopyrite and galena) within quartz carbonate veining adjacent to a sheared intrusive/volcanic contact zone.