Of the 19 holes, 17 of them are mineralized with the other two holes intersected narrow and weak anomalous radioactivity, the company said.

Hole PLS15-368 on line 480E yielded 8.98m total composite with more than 10,000cps radioactivity increasing up to 65,500cps in a 57m mineralized zone.

PLS15-368 hole complements mineralized lateral width added by holes PLS15-299 and PLS15-311, the company said.

Using step-out drilling technique, the R780E Zone boundaries have been increased on multiple lines along strike to the east, vertically and laterally north and south.

Fission Uranium president, COO, and chief geologist Ross McElroy said: "This latest round of drill results, which includes a large number of step-out holes, represents a big step forward in the continued growth of the Triple R’s R780E zone.

"In addition to expanding the overall footprint of the zone, we have successfully targeted the on-strike extension of the high-grade domain west of line 495E."

The company plans to increase winter exploration budget by $3m, adding approximately 6,270m for a total of 26,500m in 91 holes.

Additional drilled holes will test high-priority areas within the R780E zone where the high-grade domain is believed to be prospective.

Further tests will be conducted on the recent discovery of mineralization at the R600W zone.