The amount of the contract was not disclosed.
The company will deliver each rig package with an Offline Activity Crane, Wrangler WR120 Iron Roughneck, Wrangler PW5000 Elevated Catwalk and Rotating Mousehole.
Forum Energy Technologies chairman and CEO Cris Gaut said the company will provide pipe handling equipment to the contractor.
"The Offline Activity Crane allows for simultaneous activities to take place on the rig floor which reduces ‘flat time’ in the drilling program, hence improving rig efficiency," Gaut added.
"Forum’s PW5000 Catwalk offers improved safety and efficiency by mechanizing the transfer of tubulars to and from the drill floor.
"The WR120 Roughneck is designed specifically for rigs running pipe with premium connections, allowing for quick and efficient make up and break out of tubulars."
The delivery of the equipments is expected to be completed through the final quarter of 2012 to the first quarter of 2013.
Forum Energy Technologies is a US based provider of manufactured technologies and applied products to the energy industry.