ZADCO plans to increase the capacity of this facility to cater for an increased production profile over the next twenty years.

The Swiss engineering group will conduct site surveys, identify a range of potential expansion options and debottlenecking initiatives, and perform availability and reliability studies to derive a master plan for the facilities.

The company said that from the various options presented, one option will be selected for which Foster Wheeler will prepare the basis of design and the scope of work for the next phase of the project.

The Upper Zakum facilities at Zirku Island consist of three oil processing trains and one train on stand-by.