The report suggested that the Brownell Lake project is at an early exploration stage and additional ground geophysics, ground prospecting, geological mapping and geochemical sampling is required.

Galaxy Graphite has contracted Mackevoy Geosciences to perform the field work that includes line cutting, ground geophysics (VLF/Mag), mapping, prospecting and soil sampling.

The Phase 1 field work is expected to be completed by the end of July 2012 while the Phase 2 project work scheduled to start in early September 2012 will be to follow up on the results of the field work.

The subsequent compilation of data has also recommended diamond drilling on the property.

Galaxy Graphite has got the approval from Brownell Lake Holdings to earn 100% undivided interest in the Brownell Lake Property in three stages by paying cash, common shares, and by spending on expenditures over a three year period.