The Baltic NPP is being constructed in Kaliningrad region of Russia and will comprise two generating units with total capacity of 2.3gW.
The ordered pumping equipment will be delivered for both 1st and 2nd generating units of Baltic NPP.
The second power plant, Rostov NPP is situated in Rostov region and currently generates more than 15% of annual power supply in the region.
Pumping equipment will be produced for 4th generating unit of the NPP that is currently under construction.
HMS Group is the leading pump manufacturer and provider of flow control solutions and engineering services for oil and gas fields in Russia.