Since the beginning of the year the Company has completed 44,525 m of diamond drilling in 99 holes with up to 8 drill rigs operating on several key targets. Of this drilling, approximately 27,800 m in 46 holes have been completed at the Triangle Zone.

The Triangle results announced today are derived from an additional 9 holes representing 6,443 m. To date, 16 holes totalling 11,450 m of drilling have now been released from the 44,525 m completed in 2015.

Drilling at Triangle is focused on widely spaced step-out and extensional drilling of known mineralized zones laterally to the south, east and west, and at depth.

The Triangle Zone holes disclosed in this news release are derived from drilling on the southern, eastern and western extensions of the deposit. The Triangle Zone is located in the southern part of the Lamaque project and contains the Company’s largest and highest grade indicated resource.

Integra Gold president and CEO Stephen de Jong said: "With over 40,000 metres of drilling already completed in 2015 this was the busiest winter season in Integra’s history and has significantly advanced Lamaque South. Today’s results continue to confirm the significance of the Triangle Zone, with step out drilling successfully intersecting high grades over sizeable widths, hundreds of metres away from previous resource boundaries. The Triangle deposit remains open to the east, west, south and at depth and through ongoing exploration efforts continues to demonstrate its ability to grow.