During the drilling operation of one of the development wells B18 (gas injection well), a deviation occurred in the well trajectory resulting in damage in the production pipe of the adjacent well B12.

For security reasons, all the platform wells have been shut down. A task force of specialists has been set up to evaluate and remedy the situation.

Al Jurf production capacity is around 45,000 barrels per day. The Al-Jurf field is a wellhead platform, which produces to an anchored FPSO located 3km away in a water depth of approximately 90 meters offshore Libya.