The drill hole AR-14-15, located in Athabasca Basin, in the 100% owned property of Rook 1 drilled 15th hole at the property.

Following encouraging results, the summer drilling programme was stepped up to 18,500m from 13,500m of diamond drilling. During drilling, upper high grade Uranium was found at a depth of 22.35m and lower high grade Uranium at a depth of 32.0m.

NexGen vice president of Exploration and Development, Garrett Ainsworth said, "These assay results include narrow intervals of ultra-high grade, which reinforces the immense size and strength of the mineralizing system that precipitated Arrow."

NexGen CEO Leigh Curyer said, "The primary objective of the summer programme was to establish a large area of mineralization, which we have achieved very quickly by aggressive large step outs. In only 22 holes, the team has established a mineralized zone of 515 x 180m.

"Secondary, was to obtain an assessment on grade. These are the highest grade assay results over significant intervals to date at Arrow, which have exceeded expectation considering the stage of development."