The wind farm is located at an altitude of 1,500m at an average annual speed prevailing of 6.9 m/s.

The project comprises of eleven N100/2500 wind power systems, especially designed for sites with medium wind speeds.

Under these conditions, the turbines are able to generate an annual yield of 60GWh.

Installation work is scheduled to commence as soon as 2012.