Under the terms of the contract, REpower will deliver 54 turbines each with a capacity of 6.15MW for the Gode Wind I wind farm.

At the Gode Wind I site, , which is based in the German North Sea, the water is between 28m and 34m deep.

REpower’s wind turbines are set to be deployed and commissioned in 2015.

The Gode Wind I wind farm will provide power to around 324,000 households.

The REpower 6MW wind turbine is produced in Bremerhaven.

REpower CEO Andreas Nauen said PNE is one of the first developers in Germany to switch to multi-megawatt turbines with an output in excess of 5MW.

REpower is engaged in developing, constructing and distributing wind turbines across the globe.