The ADCCs will serve four Toshiba 70MW steam turbines at the new plant which is being constructed in the Rift Valley of Kenya.

SPX received the contract from Hyundai Engineering, the full turnkey contractor for Kenya Electricity Generating Co’s Olkaria I and IV geothermal plants, which are expected to be completed by April 2014.

The ADCC technology of SPX provides low liquid/vapor side pressure drop, high thermal efficiency, minimal degradation by non-condensibles, low susceptibility to fouling and or/corrosion, and prediction of absorption of non-condensibles, the company said.