In October 2014 the equipment was packed and shipped to the plant. Previously valves have successfully passed the hydraulic, functional and strength tests, whereof a related act was signed.

Under the contract signed in December 2010 for Zaramagskaya HPP-1 "Turboatom" has produced two spherical pre-turbine gate valves with the diameter of 2 m with a dynamic head of 760 m and static head of 635 m for Pelton turbines.

In addition, the enterprise has carried out the design and delivery, as well as it will perform installation supervision and commissioning.