The company will supply two unfired natural circulation three pressure level HRSGs for use behind Siemens SGT6-5000F turbines.

Vogt Power said the HRSGs will incorporate its SMART design that features a high level of pre-assembly, thereby simplifying and streamlining the processes for on-site construction.

The primary fuel for the Termozulia III power plant will be oil with moderate natural gas firing.